Generate your own energy at home.

Take advantage of subsidies for solar panels and batteries for private homes.

Benefit also from the deduction of

25% of the photovoltaic installation



30% off if batteries are included

Benefit also from the deduction of

25% of the photovoltaic installation



30% off if batteries are included

Our housing kits

KIT 1

1,8kWp

Photovoltaic installation of 4 solar panels

2 kW inverter

5kWh battery

Approximately 2,000 kWh of annual generation for consumption of approximately 2,000 - 3,000 kWh.

SOLAR PANELS: €4,933.10 (VAT included)

BATTERIES: €4,668.91 (VAT included)

Our housing kits

KIT 1

1,8kWp

Photovoltaic installation of 4 solar panels

2 kW inverter

5kWh battery

Approximately 2,000 kWh of annual generation for consumption of approximately 2,000 - 3,000 kWh.

SOLAR PANELS: €4,933.10 (VAT included)

BATTERIES: €4,668.91 (VAT included)

KIT 2

2,7kWp


Photovoltaic installation of 6 solar panels

3kW inverter

5kWh battery

Approximately 3,000 kWh of annual generation for consumption of approximately 3,000 - 4,000 kWh.


SOLAR PANELS: €5,685.32 (VAT included)

BATTERIES: €4,668.91 (VAT included)

KIT 2

2,7kWp


Photovoltaic installation of 6 solar panels

3kW inverter

5kWh battery

Approximately 3,000 kWh of annual generation for consumption of approximately 3,000 - 4,000 kWh.


SOLAR PANELS: €5,685.32 (VAT included)

BATTERIES: €4,668.91 (VAT included)

KIT 3

3,6kWp


Photovoltaic installation of 8 solar panels

4kW inverter

5kWh battery

Approximately 4,000 kWh of annual generation for consumption of approximately 4,000 - 5,000 kWh.


SOLAR PANELS: €6,492.57 (VAT included)

BATTERIES: €4,668.91 (VAT included)

KIT 3

3,6kWp


Photovoltaic installation of 8 solar panels

4kW inverter

5kWh battery

Approximately 4,000 kWh of annual generation for consumption of approximately 4,000 - 5,000 kWh.


SOLAR PANELS: €6,492.57 (VAT included)

BATTERIES: €4,668.91 (VAT included)

KIT 4

4.5kWp


Photovoltaic installation of 10 solar panels

5kW inverter

5kWh battery

Approximately 5,000 kWh of annual generation for consumption of approximately 5,000 - 6,000 kWh.


SOLAR PANELS: €7,124.09 (VAT included)

BATTERIES: €4,668.91 (VAT included)

KIT 4

4.5kWp

Photovoltaic installation of 10 solar panels

5kW inverter

5kWh battery

Approximately 5,000 kWh of annual generation for consumption of approximately 5,000 - 6,000 kWh.

SOLAR PANELS: €7,124.09 (VAT included)

BATTERIES: €4,668.91 (VAT included)

x10

KIT 5

5,4kWp


Photovoltaic installation of 12 solar panels

5kW inverter

10kWh battery

Approximately 6,000 kWh of annual generation for consumption of approximately 6,000 - 7,000 kWh.


SOLAR PANELS: €7,708.60 (VAT included)

BATTERIES: €7,611.12 (VAT included)

KIT 5

5,4kWp


Photovoltaic installation of 12 solar panels

5kW inverter

10kWh battery

Approximately 6,000 kWh of annual generation for consumption of approximately 6,000 - 7,000 kWh.


SOLAR PANELS: €7,708.60 (VAT included)

BATTERIES: €7,611.12 (VAT included)

x12

KIT 6

6.3kWp

Photovoltaic installation of 14 solar panels

6kW inverter

10kWh battery

Approximately 7,000 kWh of annual generation for consumption of approximately 7,000 - 8,000 kWh.

SOLAR PANELS: €8,361.37 (VAT included)

BATTERIES: €7,611.12 (VAT included)

x14

All facility prices include VAT.

KIT 6

6.3kWp


Photovoltaic installation of 14 solar panels

6kW inverter

10kWh battery

Approximately 7,000 kWh of annual generation for consumption of approximately 7,000 - 8,000 kWh.


SOLAR PANELS: €8,361.37 (VAT included)

BATTERIES: €7,611.12 (VAT included)

All facility prices include VAT.

Grant management and justification

The grant application fee is €250 and the post-construction justification fee is €125 (always contingent on the grant being awarded).

Are you interested in installing solar panels in your home?

STEPS TO FOLLOW

Send us an electricity bill

With your latest electricity bill, which shows the annual consumption graph and the price of electricity, we will conduct a detailed study and be able to send you an estimated quote.

Technician visit

If you agree with the quote, we will send one of our technicians to inspect the electrical installation.

agree on the location of the equipment, cable run, and anticipate possible unforeseen events.

Documentation

Eseki prepares the technical report and documentation for the city council. The client submits it.

Process the grant

At Eseki, we handle the grant application process. This initial step is free.

Initial payment

The invoice is issued and 40% of the total installation cost is paid as a reservation and materials order.

Assembly and legalization

We currently have a 20-week waiting list for installations due to high demand.

60% payment

The remaining 60% of the bill is paid upon commissioning of the installation.

Justification and aid

Once the installation is complete, the required documentation is submitted and the grant application is monitored. If the grant application is approved, a fee of €375.00 VAT will be charged for the consultation and documentation services.




REQUEST A QUOTE



If you would like to receive a quote for installing solar panels in your home, please write to us using the form.


We will be happy to answer you as soon as possible.


Office Tel.: 948 46 11 35

Store phone number: 948 56 41 69




Contact us

Call us or write to us via WhatsApp using the icon link.

621 23 36 31

Email

renovables@eseki.com

Frequently Asked Questions

Here you'll find answers to some of our most frequently asked questions. If you have any further questions, please don't hesitate to contact our team. We'll be happy to assist you.

What kind of installation do I need?


We perform a free personalized study based on your electricity bill.


How much can I save?


It depends on several factors; the study will show the savings in each case.


Are there any subsidies?


Yes, there is a direct subsidy of €600 for each kWp of solar panels and €490 for each kWh of energy storage. Additionally, in Navarre, there is a 25% tax deduction on the installation cost if it is solely photovoltaic and 30% if it includes a battery.


Can I apply for the grant and then carry out the installation?


Yes, there is a period of 10 months after the resolution to carry out and justify the installation.


Do you manage the grant?


Yes, all our budgets include a line item for applying for and justifying grants. Payment is only required if the grant is awarded.


What warranty do the installation and the different materials have?


The photovoltaic panels have a 12-year warranty and the inverters a 10-year warranty. For the rest of the installation, we provide a 2-year installation warranty, excluding labor.


How does a facility of this type work?


The system generates energy from solar radiation and feeds it into the home's electrical panel, reducing consumption. Excess energy is fed back into the grid. If a battery is installed, the excess energy is stored for later use.


What happens to the energy I have left over?


Excess energy is compensated on the electricity bill.


What information is needed to provide a quote for an installation?


To carry out the study we need a recent electricity bill showing the consumption graph for the last year, a description of the house and its location.


How is the structure anchored to the roof?


It depends on the type of roof:

Tile on concrete or celetip: Threaded rod with chemical anchor and sieve.

Tile on wood: double threaded rod or tile saver.

Others: each case is evaluated individually.


Can a photovoltaic installation cause leaks?


No, the installations are carried out in a way that guarantees the roof's watertightness remains intact. The perforations in the tiles are made at the crest, where water doesn't run, and are properly sealed.


What orientation should my roof have in order to install solar panels?


The ideal orientation is south. However, east and west orientations are also valid, with a reduction in generation of only 10-15% compared to the south.


If I do the installation without batteries, can I add them in the future?


Yes, all our residential installations are prepared to have batteries added.